Sample Work

What you actually get.

Most fractional CFO sites describe the work. This page shows it: the Assessment, the 13-week cash forecast, and the monthly leadership package, built for one company from start to finish.

Illustrative only. Sample Co. is a fictional company. The numbers are invented to show the format and depth of the work. They are not a client and not real results.

The Company

Sample Co. Mechanical

A commercial heating and air-conditioning (HVAC) contractor with 32 employees, run by its owner. Two businesses under one roof: installation projects bid to general contractors, and a service and maintenance department. One bookkeeper on QuickBooks, an outside CPA for taxes, no controller.

Revenue
$6.2M
$4.0M installation, $2.2M service
Gross margin
25.1%
18% installation, 38% service
Operating profit (EBITDA)
$306K
4.9% of revenue
The owner's question
"We're busy and growing. Why is there never any cash?"
1. The Financial Assessment, $2,500

Five profit leaks, ranked and sized in dollars.

About 20–25 hours of work on 12 months of books, job files, and payroll. The deliverable is a short written report and a 60-minute debrief. This is its summary page.

Recoverable profit: $191K to $358K a year

Against operating profit of $306K today. Each bar runs from the conservative case to the full estimate.

1Install jobs finish 6 points below bid margin
$60K–$120K
2Field changes done but never billed
$42K–$84K
3Service rate unchanged for two years
$50K–$84K
4Service techs bill 58% of paid hours
$31K–$62K
5One general contractor pays 33 days late
$8Kplus $90K cash, once
Total, per year
$191K–$358K
Conservative caseUp to the full estimate
1Install jobs bid at 24% margin finish at 18%
What I found
Of 14 install jobs closed in the last 12 months, 6 overran labor budgets by more than 15%. Nobody sees it until the job closes, because there's no monthly work-in-process (WIP) schedule.
The fix
A monthly WIP schedule, with each project manager estimating cost to complete. Flag any job whose projected margin drops 3 points below bid, while there's still time to act.
The math
6-point fade × $4,000,000 = $240,000. Estimate assumes half the fade is recoverable = $120,000; low case a quarter.
2Field changes done but never billed
What I found
Sampled 8 closed install jobs: 23 field changes performed, 9 billed. Unbilled work averaged 2.1% of contract value.
The fix
Written change-order log on every job, project manager signs it weekly, and the bookkeeper won't close a job until open changes are billed or waived in writing.
The math
$4,000,000 install revenue × 2.1% = $84,000. Low case assumes half is recoverable once the log exists (some changes get waived to keep the general contractor happy).
3Service labor rate hasn't moved in two years
What I found
Service bills $115/hr, unchanged since 2024, while labor cost per hour is up about 9%. Local commercial rates run $125–135.
The fix
Raise to $123/hr on new work orders and at each maintenance-contract renewal. Track churn on the 20 largest service customers.
The math
10,440 billable hours × $8/hr = $83,520. Low case assumes 40% of hours stay at the old rate for a year (contract timing).
4Service techs billable 58% of paid hours
What I found
9 techs, 18,000 paid hours, 10,440 billed. Drive time and parts runs are the gap: two techs average 9 supply-house trips a week.
The fix
Stock trucks to a standard parts list, batch supply runs, and route by zone. Target 64% this year, 70% next.
The math
Closing half the gap to 70% = 1,080 hours × $115/hr × 50% contribution after materials and fuel = $62,100. Depends on demand being there; the service backlog says it is.
5One general contractor pays in 78 days on 45-day terms
What I found
The largest customer, a general contractor at about $1.0M a year (25% of install revenue), pays on average 33 days late. Nobody calls until 90 days.
The fix
Call at day 46, not day 90. Tie the next bid to how they pay. Ask for joint checks on large material buys.
The math
$1.0M ÷ 365 × 33 days = $90,411 of cash tied up. That's a cash problem, not profit: the P&L cost is only the line-of-credit interest, $90,411 × 9% = $8,137 a year.

Leak 5 is mostly a cash problem. Collecting on time frees about $90K once, but the profit effect is only the interest saved. A good assessment keeps profit and cash apart instead of adding them together to make the number look bigger.

2. The 13-Week Cash Forecast, updated weekly

Week 8 is the problem. Now there's time to fix it.

Sample Co. is profitable and has a $750K line of credit. But week 8 stacks a payroll, a truck loan payment, and an owner draw before the retainage check arrives in week 9 (retainage is the 10% a general contractor holds back until a job is finished). Cash dips $21K below the owner's $150K minimum. Seen seven weeks out, that's a phone call. Seen the Friday before, it's a scramble.

Ending cash by week

Starting balance $212K, week ending Nov 6 through Jan 29. Hover or tap a week for detail.

$100K $150K $200K $250K Nov 6 Dec 4 Jan 1 Jan 29 $129K, week 8 $253K
Week endingCash inCash outEnding
Nov 6$96K−$82K$226K
Nov 13$84K−$112K$198K
Nov 20$115K−$76K$237K
Nov 27$88K−$145K$180K
Dec 4$79K−$75K$184K
Dec 11$104K−$123K$165K
Dec 18$75K−$71K$169K
Dec 25$109K−$149K$129K
Jan 1$175K−$50K$254K
Jan 8$111K−$149K$216K
Jan 15$87K−$69K$234K
Jan 22$117K−$117K$234K
Jan 29$103K−$84K$253K
Ending cash by week Thirteen weeks of ending cash from Nov 6 to Jan 29. Cash dips to $129,000 in week 8, below the $150,000 minimum, and recovers to $253,000 by week 13. $100K $150K $200K $250K Below the $150K minimum Week ending Nov 6: ending cash $226,000 (net +$14,000 for the week) Week ending Nov 13: ending cash $198,000 (net −$28,000 for the week) Week ending Nov 20: ending cash $237,000 (net +$39,000 for the week) Week ending Nov 27: ending cash $180,000 (net −$57,000 for the week) Week ending Dec 4: ending cash $184,000 (net +$4,000 for the week) Week ending Dec 11: ending cash $165,000 (net −$19,000 for the week) Week ending Dec 18: ending cash $169,000 (net +$4,000 for the week) Week ending Dec 25: ending cash $129,000 (net −$40,000 for the week) Week ending Jan 1: ending cash $254,000 (net +$125,000 for the week) Week ending Jan 8: ending cash $216,000 (net −$38,000 for the week) Week ending Jan 15: ending cash $234,000 (net +$18,000 for the week) Week ending Jan 22: ending cash $234,000 (net +$0 for the week) Week ending Jan 29: ending cash $253,000 (net +$19,000 for the week) $129K $253K
Week endingNov 6Nov 13Nov 20Nov 27Dec 4Dec 11Dec 18Dec 25Jan 1Jan 8Jan 15Jan 22Jan 29
Cash in$96K$84K$115K$88K$79K$104K$75K$109K$175K$111K$87K$117K$103K
Cash out−$82K−$112K−$76K−$145K−$75K−$123K−$71K−$149K−$50K−$149K−$69K−$117K−$84K
Ending cash$226K$198K$237K$180K$184K$165K$169K$129K$254K$216K$234K$234K$253K

The full forecast breaks cash in and cash out into ten lines: collections by type, payroll, materials and subcontractors, overhead, loan payments, tax deposits, interest, and owner draws.

Use the same template for your business.

A free Excel file with this sample already filled in, so you can see how it works before you replace it with your own numbers. No email required.

Download the template
3. The Monthly Leadership Package, October 2026

One page. What happened, what's at risk, what to decide.

Delivered after the books close each month and walked through in a working session. The point isn't the report. It's the three decisions at the bottom.

Scorecard

October results against budget and targets.

Revenue
$548K
On trackBudget $530K (+3%)
Gross margin
23.8%
BehindBudget 26.0%
Install margin
16.9%
BehindBid average 24%
Service margin
39.2%
On trackBudget 38%
Backlog
$2.9M
On trackAbout 9 months of install work
Days to collect
61
BehindTarget 45 days
Tech billable hours
59%
BehindTarget 64%
Cash + open credit line
$712K
On track$212K cash, $500K line available

Job watchlist

Installation jobs whose projected margin has moved from the bid.

JobContractCompleteBid marginProjectedChangeWhat's happening
2417 Medical office heating and cooling retrofit $640K
55%
23% 11% −12 pts Ductwork labor running 30% over. Added duct scope was never priced as a change order.
2409 Warehouse rooftop units $280K
85%
22% 17% −5 pts $14K of field changes unbilled. Bill before closeout.
2422 School chiller replacement $410K
30%
25% 24% −1 pt On track.

Decisions this month

What the owner needs to decide before the next close.

  1. Approve the service rate increase to $123/hr on new work orders starting December 1.
  2. Meet with the Job 2417 project manager this week: price the added duct scope as a change order (about $38K) before the work is finished.
  3. Cover week 8: call the general contractor about the $60K invoice now at 71 days. If it isn't paid by week 6, move the week 8 owner draw to week 9 and borrow $25K on the line for one week.

See the whole package.

The full October package as a client would get it: the month at a glance, income statement against budget, balance sheet and working capital, the 13-week cash forecast, and the job watch list. Six pages, fictional company. No email required.

Download the sample package (PDF)
Your Numbers

Want to see this for your business?

A first call is 30 minutes, free, and direct. Bring your biggest money question.

Book a working session See pricing